New state of the art visual production LED screens to the new digital / visual classroom.
Therfield School
Value: £1,367,423
Duration: 43 Weeks
Demolition of existing science block. Design and build the single storey classroom and prep room science block on site of original building.
Mayville Primary School
Value: £627,000
Duration: 32 Weeks
Demolition of existing demountable classroom and erecting a new build single storey timber framed flat roof/ dual teaching block.
Jotmans Hall Primary School
Value: £255,163
Duration: 22 Weeks
Design the new safeguarding project to include the extension of the main pupil entrance. This building extends the reception and creating new offices, meeting, and medical rooms.
Chesterton Primary School
Value: £263,480.85
Duration: 12 Weeks
The removal of the existing RAAC panels and reconstruction of the roof deck. The works includes temporary work support, crash deck and temporary kentledge roof.
Warren Road, Chingford
Value: £236,000
Duration: 30 Weeks (Current project)
Construction of a new build 3 bedroom detached house. This exciting project incorporates both traditional construction methods.
St Martin’s School
Value: £29,711
Duration: 2 Weeks
Removal, isolation and preparation to receive new Hi Zone full solid grade laminated privacy cubicles with new vanity units to the student male and female vanity units.
Woodville Primary School
Value: £759,000
Duration: 30 Weeks
The construction of a new class base containing 3 large classrooms, Girls and Boys WC area with a link canopy joining onto the new School.