Manor Community Primary School

Manor Community Primary School

Value: £334,774
Duration: 14 Weeks

Provide high level Access to facilitate the removal of the External Asbestos panels and replace and upgrade the existing façade with new Aluminium Windows and doors to eleven areas.

Read More

Royal Rise School

Value: £365,000
Duration: 14 Weeks

The replacement and upgrading the existing façade with new Aluminium Windows and doors. These are complemented by the new mixture of external cladding which certainly matches the schools’ beautiful gardens and surroundings.

Read More

Cardinal Pole Classroom and External Works

Value: £236,000
Duration: 8 Weeks

Adaption and re-modelling to the first floor to create a new classroom. The works included new extensive M&E works plus Fresh air ventilation and fully equipped air-conditioning.

Read More
Thames View Infants School

Thames View Infants School

Value: £401,715
Duration: 14 Weeks

The careful removal and replacement of a large permanent modular classroom including alterations and the installation of new services.

Read More
Chalfont St Peters

Chalfont St Peters, C of E Academy

Value: £85.604.73
Duration: 2 Weeks

The replacement and upgrading the existing curved façade with new Aluminium Windows and doors to match existing. These beautiful windows are complemented by the traditional features of this Georgian Building, beautiful gardens and surroundings.

Read More

Royal Liberty School

Value: £344,000
Duration: 20 Weeks

The replacement and upgrading of all fire doors, screens and windows matching the beautiful timber windows and the unique ironmongery.

Read More

St Albans School DPM

Value £208,000
Duration 6 Weeks

Due to water ingress from below the existing concrete slab, it was necessary to remove the existing floor substructure.

Read More

Cardinal Pole School, Sixth Form

Value £231.000
Duration 16 Weeks

Undertake adaption and re-modelling of all floors, creating new classrooms and sixth form room.

Read More

Corringham Primary School

Value £253,000
Duration 20 Weeks

Refurbishment of link corridor and under pinning to existing Block. This Victorian Period school requires vast under pining to the front block.

Read More

Beacon Hill Academy

Value: £69,000
Duration: 10 Weeks

The creation of new class space adjacent to an existing classroom for pupils with severe and complex learning difficulties. Utilising the large grounds, a new Aluminium framed structure created additional space for the joined classroom.

Read More

Larkrise Primary School

Value: £125,000
Duration: 6 Weeks

Kitchen refurbishment with new white rock walling, flooring and modernisation of the toilets and storage areas.

Read More

Great Baddow High School Chelmsford

Value: £183,600
Duration: 7 Weeks

Refurbishment of a new classroom and renovation of new staff room and boys/girls toilet facilities. This incorporated Asbestos removal and new IPS cubicles.

Read More

The Bromfords School and Sixth Form College - Changing rooms

Value: £184,000
Duration: 10 Weeks

Refurbishment of boys and girls changing room and shower facilities. This incorporates new IPS cubicles to both WC and shower areas.

Read More

The Bromfords School and Sixth Form College

Value: £9,000
Duration: 1 Week

Internal refurbishment forming new lift boxes within existing classrooms

Read More
Sure_Port Folio_Main Page Image_08_West Hatch School

West Hatch High School

Value: £147,000
Duration: 10 Weeks

Refurbish swimming pool facilities, including new changing amenities areas to be girls and boys blocks, with mechanical and electrical works, including upgrading with new WC’s and showers within an occupied school.

Read More