Alderney Street SW1V

Value £540,000
Duration 28 Weeks

The internal refurbishment of this Victorian dwelling including a stunning structural atrium from the lower ground to first Floor.

Read More
Image Placeholder2

Heron Way, Hutton Mount

Value: £212,840.68
Duration: 21 Weeks

Renovation of a beautiful, detached house within Hutton Mount which incorporates a large new side and rear extension creating an amazing indoor garden room and kitchen.

Read More

Stock Road, Billericay, Essex

Value: £149,294
Duration: 19 Weeks 

Renovation of a beautiful detached house, incorporating a large new rear extension with bespoke landscaping.

Read More

The Mews, Chusan Place, E14

Value: £240,000
Duration: 24 Weeks 

This historic hidden Mews house located in Commercial Road will be converted from a commercial property into a beautiful family home.

Read More

6 Seven Arches

Value: £270,000
Duration: 30 Weeks

Renovation and re-development of a beautiful detached house incorporating a new rear extension and large loft conversion.

Read More

Westbury Road CM14

Value £119,000
Duration 14 Weeks

New 2nd floor mansard construction blending with the existing external façade.

Read More

Crofton Lane, Kent

Value £150,000
Duration 22 Weeks

New 2nd floor mansard construction blending with the existing external façade.

Read More
Stansted Social Club_New

Stansted Social Club

Value: £90,000
Duration: 10 Weeks

Renovation and structural repairs to traditional timber frame building. This unique and beautiful building dates back to 1890. The building requires some key structural repairs.

Read More

St Margarets Church, Finchley

Value: £95,000
Duration: 12 Weeks

Working as a sub-contractor to a major Principal Contractor our carpentry package includes creating six new luxury apartments together with an apartment within a existing Church.

Read More

Blythwood Road, Stansted MF

Value: £255,000
Duration: 25 Weeks 

Construction of traditional timber frame, front, side and rear extension. This 4 bedroom / 4 bathroom dwelling also includes a modified pitch roof with high end finishes.

Read More

Minerva House, Lift Enhancement

Value: £110,000
Duration: 20 Weeks (Design: 6 Weeks, Installation and procurement: 14 Weeks)

Design and procure specialist bronzed mesh from America. Insitu Fabrication and installation of new metal framework forming bespoke lift enclosure over 6 floors

Read More
Czarina Rise

Czarina Rise, Basildon

Value: £29,986.55
Duration: 4 Weeks

Due to movement in this Timber framed building, we are required to carefully remove the surrounding brickwork enabling the existing top floor windows to be removed.

Read More